SSelect Stadium/Arena Installations…

  • Project: Bert Ogden Arena
  • Location: Edinburg, TX
  • Fire Pump: A-C 8x6x10F 1250 GPM @ 95 PSI
  • Fire Pump Motor: 100 HP
  • Fire Pump Controller: Tornatech GPA+GPU-480/100/3/60 with ATS
  • Completion Date: Aug. 7, 2018
  • Contractor: Fire Systems of Texas

  • Project: AT&T Stadium
  • Location: Arlington, TX
  • Fire Pump: Peerless 6AEF16 1250 GPM @ 120 PSI
  • Fire Pump Motor: 125 HP
  • Fire Pump Controller: Metron MP435-125-480C with ATS
  • Completion Date: 2009
  • Contractor: Northstar Fire Protection

  • Project: Allen ISD Stadium
  • Location: Allen, TX
  • Fire Pump: A-C 8x6x18F 1250 GPM @ 100 PSI
  • Fire Pump Motor: 100 HP
  • Fire Pump Controller: Eaton FT80-100D-L1 with ATS
  • Completion Date: Aug. 9, 2012
  • Contractor: Golden Triangle Fire Protection